ITAC Assessment: OR0268
ITAC logo
ITAC Assessment: OR0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Woolen Textiles
NAICS
n/a
SIC 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing)
Sales Range $10
M
to 50
M
# of Employees 242
Plant Area 308,521
ft2
Annual Production 13,691
thousand feet
Production Hrs. Annual 3,840
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,867 10,963,072
kWh
Electricity Demand $104,758 27,624
kW-mo/yr
Natural Gas $257,823 101,564
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Water Consumption Savings
01 2.4133: Use most efficient type of electric motors $10,758 $29,409 $7,285
323,857
kWh
$3,473
-
kW-mo/yr
- - - - -
02 2.2621: Modify refrigeration system to operate at a lower pressure $1,405 $8,000 $1,405
62,427
kWh
- - - - - -
03 3.3128: Utilize other methods to remove contaminants $3,361 $22,130 - - - $1,618
-
lb
$820
-
lb
$902 $21
-
Tgal
04 2.1232: Keep boiler tubes clean $6,924 $59,280 - - $6,924
-
MMBtu
- - - -
TOTAL RECOMMENDED $22,448 $118,819 $8,690
386,284
kWh
$3,473
-
kW-mo/yr
$6,924
-
MMBtu
$1,618
-
lb
$820
-
lb
$902 $21
-
Tgal
TOTAL IMPLEMENTED $17,682 $88,689 $7,285
323,857
kWh
$3,473
-
kW-mo/yr
$6,924
-
MMBtu
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs