ITAC Assessment: OR0265
ITAC logo
ITAC Assessment: OR0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Formed Sheet Metal
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 50,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,647 1,415,006
kWh
Electricity Demand $12,058 2,868
kW-mo/yr
Electricity Fees $576 -
Natural Gas $19,315 4,566
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,844 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,943

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.6125: Keep equipment clean $2,162 - - - $2,282
-
MMBtu
- $(-120.0)
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,493 $1,000 $1,222
33,705
kWh
$271
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $1,288 $2,371 $1,012
28,136
kWh
$276
-
kW-mo/yr
- - -
04 3.6112: Use filter and drying oven to reduce sludge volume $20,901 $62,500 $(-91.0)
(-2,638)
kWh
- $(-500.0)
-
MMBtu
$19,532
-
Tgal
$1,960
TOTAL RECOMMENDED $25,844 $65,871 $2,143
59,203
kWh
$547
-
kW-mo/yr
$1,782
-
MMBtu
$19,532
-
Tgal
$1,840
TOTAL IMPLEMENTED $4,943 $3,371 $2,234
61,841
kWh
$547
-
kW-mo/yr
$2,282
-
MMBtu
- $(-120.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs