Assessment Year | 1996 |
---|---|
Principal Product | Manufactured Homes |
NAICS |
n/a
|
SIC | 2452: Prefabricated Wood Buildings and Components |
Sales Range | $50 M to 100M |
# of Employees | 440 |
Plant Area |
400,000
ft2
|
Annual Production | 1,597
pieces
|
Production Hrs. Annual | 2,016
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,816 | 1,521,688 |
kWh
|
$0.037 |
Electricity Demand | $9,176 | 4,836 |
kW-mo/yr
|
$1.90 |
Electricity Fees | $2,894 | - |
|
- |
Natural Gas | $24,744 | 5,248 |
MMBtu
|
$4.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $125,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $125,156 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,397 | $6,000 |
$7,813
235,346
kWh
|
$1,584
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $332 | $1,229 |
$278
8,499
kWh
|
$54
-
kW-mo/yr
|
- | - | |
03 | 2.3212: Optimize plant power factor | $490 | $1,400 | - | - | $490 | - | |
04 | 3.5316: Contract a wood pallet recycling company | $115,427 | $150,000 |
$(-2,972.0)
(-89,683)
kWh
|
$(-1,101.0)
-
kW-mo/yr
|
- |
$119,500
-
lb
|
|
TOTAL RECOMMENDED | $125,646 | $158,629 |
$5,119
154,162
kWh
|
$537
-
kW-mo/yr
|
$490 |
$119,500
-
lb
|
||
TOTAL IMPLEMENTED | $125,156 | $157,229 |
$5,119
154,162
kWh
|
$537
-
kW-mo/yr
|
- |
$119,500
-
lb
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs