ITAC Assessment: OR0260
ITAC logo
ITAC Assessment: OR0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Manufactured Homes
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 440
Plant Area 400,000
ft2
Annual Production 1,597
pieces
Production Hrs. Annual 2,016
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,816 1,521,688
kWh
Electricity Demand $9,176 4,836
kW-mo/yr
Electricity Fees $2,894 -
Natural Gas $24,744 5,248
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $125,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $125,156

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,397 $6,000 $7,813
235,346
kWh
$1,584
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $332 $1,229 $278
8,499
kWh
$54
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $490 $1,400 - - $490 -
04 3.5316: Contract a wood pallet recycling company $115,427 $150,000 $(-2,972.0)
(-89,683)
kWh
$(-1,101.0)
-
kW-mo/yr
- $119,500
-
lb
TOTAL RECOMMENDED $125,646 $158,629 $5,119
154,162
kWh
$537
-
kW-mo/yr
$490 $119,500
-
lb
TOTAL IMPLEMENTED $125,156 $157,229 $5,119
154,162
kWh
$537
-
kW-mo/yr
- $119,500
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs