ITAC Assessment: UM0044
ITAC logo
ITAC Assessment: UM0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Metal heat Treating
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area 110,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,718 3,936,401
kWh
Natural Gas $294,237 132,939
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,803

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,181 $1,433 $2,181
47,479
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,738 $25,330 $2,738
59,496
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $139 $350 $139
2,931
kWh
-
04 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $4,745 $4,000 - $4,745
-
MMBtu
TOTAL RECOMMENDED $9,803 $31,113 $5,058
109,906
kWh
$4,745
-
MMBtu
TOTAL IMPLEMENTED $9,803 $31,113 $5,058
109,906
kWh
$4,745
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs