ITAC Assessment: OR0258
ITAC logo
ITAC Assessment: OR0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Frozen Fish
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 50,000
ft2
Annual Production 55,000
ton
Production Hrs. Annual 4,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,550 4,556,858
kWh
Electricity Demand $19,731 11,148
kW-mo/yr
Electricity Fees $4,132 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $1,070 - $1,070
36,049
kWh
- - - -
02 2.2628: Utilize a less expensive cooling method $24,560 $120,600 $(-400.0)
(-13,189)
kWh
- - $24,960 -
03 2.4133: Use most efficient type of electric motors $2,672 $6,584 $2,262
76,202
kWh
$410
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,134 $6,538 $2,331
78,546
kWh
$196
-
kW-mo/yr
- - $(-393.0)
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,360 - - - $1,360
-
lb
- -
TOTAL RECOMMENDED $31,796 $133,722 $5,263
177,608
kWh
$606
-
kW-mo/yr
$1,360
-
lb
$24,960 $(-393.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs