ITAC Assessment: OR0243
ITAC logo
ITAC Assessment: OR0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Aseptic Beverages
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 175,000
ft2
Annual Production 5,583
Tgal
Production Hrs. Annual 6,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,681 1,898,886
kWh
Natural Gas $106,201 26,065
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,679

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $20,308 - $6,536
181,125
kWh
$13,772
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,093 $500 - $4,093
-
MMBtu
03 2.1213: Direct warmest air to combustion intake $627 $198 - $627
-
MMBtu
04 2.2441: Preheat boiler makeup water with waste process heat $2,714 $2,108 - $2,714
-
MMBtu
05 2.4133: Use most efficient type of electric motors $278 $796 $278
5,862
kWh
-
TOTAL RECOMMENDED $28,020 $3,602 $6,814
186,987
kWh
$21,206
-
MMBtu
TOTAL IMPLEMENTED $24,679 $1,296 $6,814
186,987
kWh
$17,865
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs