ITAC Assessment: OR0238
ITAC logo
ITAC Assessment: OR0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 91,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $532,564 13,969,226
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,054

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,668 - $1,668
45,721
kWh
- -
02 2.2437: Recover waste heat from equipment $38,868 $9,488 - $38,868
-
MMBtu
-
03 2.2511: Insulate bare equipment $407 $227 - $407
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $949 $1,180 $949
26,084
kWh
- -
05 2.3212: Optimize plant power factor $3,672 $6,000 $3,672
-
kWh
- -
06 2.4322: Use or replace with energy efficient substitutes $1,402 $6,389 $1,402
39,566
kWh
- -
07 3.8132: Use less toxic and volatile solvent substitutes $9,760 - - - $9,760
08 3.1244: Reduce solution drag-out to prevent solution loss $38,994 $3,566 - - $38,994
TOTAL RECOMMENDED $95,720 $26,850 $7,691
111,371
kWh
$39,275
-
MMBtu
$48,754
TOTAL IMPLEMENTED $53,054 $17,284 $4,019
111,371
kWh
$39,275
-
MMBtu
$9,760
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings