| Assessment Year | 1995 |
|---|---|
| Principal Product | Dimensional Lumber |
| NAICS |
n/a
|
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
250,000
ft2
|
| Annual Production | 113,000,000
thousand feet
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $547,550 | 18,733,588 |
kWh
|
$0.029 |
| Wood | $420,396 | 470,716 |
MMBtu
|
$0.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $110,098 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $93,621 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $9,371 | $35,317 |
$9,371
288,687
kWh
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,388 | - |
$1,388
43,669
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,053 | $12,418 |
$8,623
280,481
kWh
|
$2,186 | $2,244 | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $6,163 | - |
$4,650
159,144
kWh
|
$690 | $823 | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $41,808 | $12,925 |
$41,808
1,307,151
kWh
|
- | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $29,389 | $85,872 |
$29,389
975,967
kWh
|
- | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,926 | $21,000 |
$8,926
288,101
kWh
|
- | - | |
| TOTAL RECOMMENDED | $110,098 | $167,532 |
$104,155
3,343,200
kWh
|
$2,876 | $3,067 | ||
| TOTAL IMPLEMENTED | $93,621 | $146,532 |
$89,191
2,852,286
kWh
|
$2,186 | $2,244 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs