ITAC Assessment: OR0236
ITAC logo
ITAC Assessment: OR0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Dimensional Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 250,000
ft2
Annual Production 113,000,000
thousand feet
Production Hrs. Annual 4,080
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $547,550 18,733,588
kWh
Wood $420,396 470,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,621

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $9,371 $35,317 $9,371
288,687
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,388 - $1,388
43,669
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,053 $12,418 $8,623
280,481
kWh
$2,186 $2,244
04 2.7111: Reduce illumination to minimum necessary levels $6,163 - $4,650
159,144
kWh
$690 $823
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $41,808 $12,925 $41,808
1,307,151
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,389 $85,872 $29,389
975,967
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,926 $21,000 $8,926
288,101
kWh
- -
TOTAL RECOMMENDED $110,098 $167,532 $104,155
3,343,200
kWh
$2,876 $3,067
TOTAL IMPLEMENTED $93,621 $146,532 $89,191
2,852,286
kWh
$2,186 $2,244
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs