ITAC Assessment: OR0235
ITAC logo
ITAC Assessment: OR0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product packaged juice
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 100,000
ft2
Annual Production 45,959,317
lb
Production Hrs. Annual 7,488
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,880 5,842,907
kWh
Natural Gas $28,659 8,249
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7131: Add area lighting switches $2,089 $2,200 $2,089
49,824
kWh
-
02 2.4133: Use most efficient type of electric motors $2,052 $2,592 $2,052
43,962
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $250 $500 - $250
-
MMBtu
04 2.2437: Recover waste heat from equipment $1,680 $4,000 - $1,680
-
MMBtu
05 2.2627: Use multiple-effect evaporators $2,900 $9,500 $2,900
58,910
kWh
-
06 2.2621: Modify refrigeration system to operate at a lower pressure $1,970 $8,500 $1,970
47,186
kWh
-
TOTAL RECOMMENDED $10,941 $27,292 $9,011
199,882
kWh
$1,930
-
MMBtu
TOTAL IMPLEMENTED $8,971 $18,792 $7,041
152,696
kWh
$1,930
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs