ITAC Assessment: OR0230
ITAC logo
ITAC Assessment: OR0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product prepared salads
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 45,000
ft2
Annual Production 7,695,000
lb
Production Hrs. Annual 5,424
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,912 1,136,870
kWh
Natural Gas $21,144 4,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,088 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,689

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7111: Reduce illumination to minimum necessary levels $2,029 $40 $2,029
28,136
kWh
- - -
02 2.1133: Adjust burners for efficient operation $660 $1,000 - $660
-
MMBtu
- -
03 2.3212: Optimize plant power factor $994 $2,600 $994
-
kWh
- - -
04 3.4113: Treat and reuse rinse waters $463 - - - $463
-
Tgal
-
05 3.7212: Improved material handling (mixing and transfer) $12,942 $1,372 - - - $12,942
-
lb
TOTAL RECOMMENDED $17,088 $5,012 $3,023
28,136
kWh
$660
-
MMBtu
$463
-
Tgal
$12,942
-
lb
TOTAL IMPLEMENTED $2,689 $1,040 $2,029
28,136
kWh
$660
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs