ITAC Assessment: OR0226
ITAC logo
ITAC Assessment: OR0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product colored rolled glass
NAICS
n/a
SIC 3211: Flat Glass
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area 20,000
ft2
Annual Production 401
thousand feet
Production Hrs. Annual 5,482
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,128 279,015
kWh
Natural Gas $129,817 30,954
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $471

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $396 $492 $396
8,499
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $75 $70 $75
2,052
kWh
-
03 2.2414: Use waste heat from hot flue gases to preheat $9,116 $70,000 - $9,116
-
MMBtu
TOTAL RECOMMENDED $9,587 $70,562 $471
10,551
kWh
$9,116
-
MMBtu
TOTAL IMPLEMENTED $471 $562 $471
10,551
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs