ITAC Assessment: OR0225
ITAC logo
ITAC Assessment: OR0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Fish Meal
NAICS
n/a
SIC 2077: Animal and Marine Fats and Oils
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area
n/a
Annual Production 20,600,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,871 176,729
kWh
Natural Gas $18,649 4,483
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,688 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,649

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $3,420 - $2,096
63,013
kWh
- $1,324 -
02 2.4133: Use most efficient type of electric motors $4,415 $10,402 $4,415
113,423
kWh
- - -
03 2.8112: Combine utility meters $4,844 $2,863 - - - $4,844
04 2.1233: Analyze flue gas for proper air/fuel ratio $18,649 $500 - $18,649
-
MMBtu
- -
05 2.3212: Optimize plant power factor $4,360 $13,200 $4,360
-
kWh
- - -
TOTAL RECOMMENDED $35,688 $26,965 $10,871
176,436
kWh
$18,649
-
MMBtu
$1,324 $4,844
TOTAL IMPLEMENTED $18,649 $500 - $18,649
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs