ITAC Assessment: OR0218
ITAC logo
ITAC Assessment: OR0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Electronic Capacitors
NAICS
n/a
SIC 3675: Electronic Capacitors
Sales Range $10
M
to 50
M
# of Employees 640
Plant Area 84,000
ft2
Annual Production 2,700,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $398,371 14,713,365
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,545 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,482

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (haz) Savings
01 2.4133: Use most efficient type of electric motors $1,336 $2,262 $1,336
44,256
kWh
- -
02 2.4133: Use most efficient type of electric motors $503 $4,100 $503
21,395
kWh
- -
03 2.3212: Optimize plant power factor $7,770 $10,000 $7,770
-
kWh
- -
04 2.2447: Heat water with exhaust heat $4,938 $8,847 $4,938
208,382
kWh
- -
05 3.1191: Change procedures / equipment / operating conditions $28,438 $35,000 - - $28,438
-
lb
06 3.3131: Use evaporation to concentrate material $7,560 $38,847 - $7,560
-
Tgal
-
TOTAL RECOMMENDED $50,545 $99,056 $14,547
274,033
kWh
$7,560
-
Tgal
$28,438
-
lb
TOTAL IMPLEMENTED $42,482 $56,109 $14,044
252,638
kWh
- $28,438
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs