ITAC Assessment: OR0216
ITAC logo
ITAC Assessment: OR0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Zinc Plating
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area
n/a
Annual Production 29,000,000
lb
Production Hrs. Annual 7,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,421 322,392
kWh
Natural Gas $417,243 41,724
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,315 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.2136: Install / repair insulation on steam lines $1,306 $797 - $1,306
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,327 $4,643 $2,327
49,824
kWh
- -
03 2.7134: Use photocell controls $1,499 $2,210 $1,499
35,756
kWh
- -
04 2.4133: Use most efficient type of electric motors $45 $286 $45
879
kWh
- -
05 3.1244: Reduce solution drag-out to prevent solution loss $35,138 - - - $35,138
-
lb
TOTAL RECOMMENDED $40,315 $7,936 $3,871
86,459
kWh
$1,306
-
MMBtu
$35,138
-
lb
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs