Assessment Year | 1994 |
---|---|
Principal Product | Hot Dip Galvanizing |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
20,000
ft2
|
Annual Production | 20,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,330 | 820,926 |
kWh
|
$0.047 |
Natural Gas | $100,913 | 25,900 |
MMBtu
|
$3.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,391 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $98,659 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $732 | $750 |
$732
15,533
kWh
|
- | - | |
02 | 2.1116: Improve combustion control capability | $27,860 | $12,000 | - |
$27,860
-
MMBtu
|
- | |
03 | 2.7124: Make a practice of turning off lights when not needed | $274 | - |
$274
7,034
kWh
|
- | - | |
04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $2,640 | $2,670 |
$2,640
67,702
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $185 | $248 |
$185
4,103
kWh
|
- | - | |
06 | 3.1191: Change procedures / equipment / operating conditions | $67,700 | $260,000 | - | - |
$67,700
-
lb
|
|
TOTAL RECOMMENDED | $99,391 | $275,668 |
$3,831
94,372
kWh
|
$27,860
-
MMBtu
|
$67,700
-
lb
|
||
TOTAL IMPLEMENTED | $98,659 | $274,918 |
$3,099
78,839
kWh
|
$27,860
-
MMBtu
|
$67,700
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs