ITAC Assessment: OR0204
ITAC logo
ITAC Assessment: OR0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Milk
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 42,000
ft2
Annual Production 65,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,912 3,112,544
kWh
Natural Gas $23,857 5,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,648

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2625: Chill water to the highest temperature possible $11,122 $5,000 $11,122
386,870
kWh
-
02 2.2621: Modify refrigeration system to operate at a lower pressure $912 $3,000 $912
40,445
kWh
-
03 2.2437: Recover waste heat from equipment $7,860 $8,997 - $7,860
-
MMBtu
04 2.3212: Optimize plant power factor $4,057 $5,100 $4,057
-
kWh
-
05 2.2136: Install / repair insulation on steam lines $2,378 $1,394 - $2,378
-
MMBtu
06 2.4133: Use most efficient type of electric motors $376 $1,075 $376
11,723
kWh
-
TOTAL RECOMMENDED $26,705 $24,566 $16,467
439,038
kWh
$10,238
-
MMBtu
TOTAL IMPLEMENTED $22,648 $19,466 $12,410
439,038
kWh
$10,238
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs