ITAC Assessment: OR0198
ITAC logo
ITAC Assessment: OR0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Manufactured Homes
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 312
Plant Area 122,000
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,623 805,979
kWh
Natural Gas $40,386 8,034
MMBtu
LPG $28,965 3,496
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,556 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,090

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,135 $2,000 $2,135
37,515
kWh
-
02 2.2437: Recover waste heat from equipment $1,309 $1,875 - $1,309
-
MMBtu
03 2.6125: Keep equipment clean $1,630 $246 - $1,630
-
MMBtu
04 2.1331: Burn a less expensive grade of fuel $2,712 $2,495 - $2,712
-
MMBtu
05 2.3212: Optimize plant power factor $479 $1,200 $479
-
kWh
-
06 2.4133: Use most efficient type of electric motors $134 $298 $134
2,638
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $157 $633 $157
3,224
kWh
-
TOTAL RECOMMENDED $8,556 $8,747 $2,905
43,377
kWh
$5,651
-
MMBtu
TOTAL IMPLEMENTED $7,090 $6,239 $2,748
40,153
kWh
$4,342
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs