Assessment Year | 1994 |
---|---|
Principal Product | Manufactured Homes |
NAICS |
n/a
|
SIC | 2452: Prefabricated Wood Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 312 |
Plant Area |
122,000
ft2
|
Annual Production | 1,500
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $42,623 | 805,979 |
kWh
|
$0.053 |
Natural Gas | $40,386 | 8,034 |
MMBtu
|
$5.03 |
LPG | $28,965 | 3,496 |
MMBtu
|
$8.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,556 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,090 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,135 | $2,000 |
$2,135
37,515
kWh
|
- | |
02 | 2.2437: Recover waste heat from equipment | $1,309 | $1,875 | - |
$1,309
-
MMBtu
|
|
03 | 2.6125: Keep equipment clean | $1,630 | $246 | - |
$1,630
-
MMBtu
|
|
04 | 2.1331: Burn a less expensive grade of fuel | $2,712 | $2,495 | - |
$2,712
-
MMBtu
|
|
05 | 2.3212: Optimize plant power factor | $479 | $1,200 |
$479
-
kWh
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $134 | $298 |
$134
2,638
kWh
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $157 | $633 |
$157
3,224
kWh
|
- | |
TOTAL RECOMMENDED | $8,556 | $8,747 |
$2,905
43,377
kWh
|
$5,651
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,090 | $6,239 |
$2,748
40,153
kWh
|
$4,342
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs