ITAC Assessment: NC0021
ITAC logo
ITAC Assessment: NC0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Nonmetallic strapping
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 90,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $348,821 7,874,854
kWh
Natural Gas $14,270 2,637
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,991

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,164 - $8,164
-
kWh
02 3.1161: Eliminate/reduce an operation $447 $500 $447
12,896
kWh
03 3.1161: Eliminate/reduce an operation $10,452 $500 $10,452
190,797
kWh
04 2.2612: Use cooling tower water instead of refrigeration $5,719 $8,750 $5,719
167,937
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,913 $1,332 $2,913
66,237
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,827 $390 $6,827
155,334
kWh
TOTAL RECOMMENDED $34,522 $11,472 $34,522
593,201
kWh
TOTAL IMPLEMENTED $14,991 $390 $14,991
155,334
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs