ITAC Assessment: OR0191
ITAC logo
ITAC Assessment: OR0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PCV Pipe
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 70,000,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,351 11,413,834
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,116

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $7,984 $400 $7,984
243,259
kWh
02 2.4133: Use most efficient type of electric motors $438 $567 $438
12,016
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,156 $7,425 $3,156
86,460
kWh
04 2.3212: Optimize plant power factor $5,843 $12,300 $5,843
-
kWh
05 2.2612: Use cooling tower water instead of refrigeration $36,422 $41,000 $36,422
1,110,492
kWh
06 2.2511: Insulate bare equipment $8,272 $13,663 $8,272
252,345
kWh
TOTAL RECOMMENDED $62,115 $75,355 $62,115
1,704,572
kWh
TOTAL IMPLEMENTED $53,116 $55,630 $53,116
1,618,112
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs