ITAC Assessment: OR0189
ITAC logo
ITAC Assessment: OR0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Veneer
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 80,000
ft2
Annual Production 52,000,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,243 5,075,029
kWh
Wood $76,300 47,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,764

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings Personnel Changes Savings
01 2.2514: Cover open tanks $3,192 $1,900 - $3,192
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,353 $10,000 $11,353
312,134
kWh
- -
03 2.4133: Use most efficient type of electric motors $590 $3,210 $590
19,637
kWh
- -
04 2.3212: Optimize plant power factor $9,034 $7,500 $9,034
-
kWh
- -
05 2.7124: Make a practice of turning off lights when not needed $4,483 - $3,415
189,625
kWh
- $1,068
06 2.7142: Utilize higher efficiency lamps and/or ballasts $595 $1,752 $433
18,464
kWh
- $162
TOTAL RECOMMENDED $29,247 $24,362 $24,825
539,860
kWh
$3,192
-
MMBtu
$1,230
TOTAL IMPLEMENTED $24,764 $24,362 $21,410
350,235
kWh
$3,192
-
MMBtu
$162
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Energy Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs