ITAC Assessment: OR0186
ITAC logo
ITAC Assessment: OR0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area
n/a
Annual Production 38,900,000
thousand feet
Production Hrs. Annual 4,320
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,129 2,776,378
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,105 $10,000 $17,105
413,834
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,858 $5,000 $4,858
116,354
kWh
03 2.3212: Optimize plant power factor $3,535 $7,500 $3,535
-
kWh
04 2.4133: Use most efficient type of electric motors $352 $1,320 $352
7,620
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $788 - $788
16,413
kWh
TOTAL RECOMMENDED $26,638 $23,820 $26,638
554,221
kWh
TOTAL IMPLEMENTED $21,780 $18,820 $21,780
437,867
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs