ITAC Assessment: OR0183
ITAC logo
ITAC Assessment: OR0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product TV, VCR Assembly
NAICS
n/a
SIC 3651: Household Audio and Video Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 135,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,912 5,541,911
kWh
Natural Gas $38,341 9,030
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,274 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,890

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $473 $430 $531
15,826
kWh
$(-58.0)
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,413 $1,500 $1,413
54,513
kWh
-
03 2.3212: Optimize plant power factor $9,973 $13,875 $9,973
-
kWh
-
04 2.4133: Use most efficient type of electric motors $444 $740 $444
16,413
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $159 - $159
4,103
kWh
-
06 2.2511: Insulate bare equipment $2,812 $2,841 $2,812
128,957
kWh
-
TOTAL RECOMMENDED $15,274 $19,386 $15,332
219,812
kWh
$(-58.0)
TOTAL IMPLEMENTED $10,890 $15,045 $10,948
32,239
kWh
$(-58.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs