ITAC Assessment: OR0177
ITAC logo
ITAC Assessment: OR0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Plastic Parts
NAICS
n/a
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 87,000
ft2
Annual Production 7,500,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,338 7,252,052
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,636 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,113

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.2612: Use cooling tower water instead of refrigeration $8,536 $4,000 $8,536
391,559
kWh
-
02 2.2511: Insulate bare equipment $3,577 $5,499 $3,577
164,127
kWh
-
03 2.4133: Use most efficient type of electric motors $531 $2,480 $531
18,757
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,705 $8,511 $3,114
114,009
kWh
$(-409.0)
05 2.7124: Make a practice of turning off lights when not needed $1,494 - $1,154
36,342
kWh
$340
06 2.7142: Utilize higher efficiency lamps and/or ballasts $793 $1,263 $966
36,342
kWh
$(-173.0)
TOTAL RECOMMENDED $17,636 $21,753 $17,878
761,136
kWh
$(-242.0)
TOTAL IMPLEMENTED $12,113 $9,499 $12,113
555,686
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs