ITAC Assessment: OR0174
ITAC logo
ITAC Assessment: OR0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Forklift Accessories
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 198
Plant Area
n/a
Annual Production 1,500
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,490 1,489,156
kWh
Natural Gas $7,467 1,496
MMBtu
Other Energy $52,419 4,146,814
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,821

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $991 $60 $771
27,550
kWh
$220
02 2.7142: Utilize higher efficiency lamps and/or ballasts $185 $632 $210
7,620
kWh
$(-25.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $378 $916 $645
25,498
kWh
$(-267.0)
04 2.3212: Optimize plant power factor $3,112 $3,750 $3,112
-
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,258 $1,000 $1,258
42,204
kWh
-
TOTAL RECOMMENDED $5,924 $6,358 $5,996
102,872
kWh
$(-72.0)
TOTAL IMPLEMENTED $1,821 $2,548 $2,113
75,322
kWh
$(-292.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs