ITAC Assessment: OR0172
ITAC logo
ITAC Assessment: OR0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product KIln Dried Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $500
k
to 1
M
# of Employees 13
Plant Area
n/a
Annual Production 8,395,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,881 264,361
kWh
Natural Gas $43,006 13,657
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,216

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2123: Insulate feedwater tank $246 $115 - $246
-
MMBtu
-
02 2.1232: Keep boiler tubes clean $1,216 $1,000 - $1,216
-
MMBtu
-
03 2.3212: Optimize plant power factor $283 $270 $283
-
kWh
- -
04 2.7141: Lower light fixtures in high ceiling areas $294 $757 $234
8,206
kWh
- $60
05 2.4133: Use most efficient type of electric motors $39 $134 $39
1,465
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $208 $1,550 $208
7,913
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,665 $16,830 $1,665
76,495
kWh
- -
TOTAL RECOMMENDED $3,951 $20,656 $2,429
94,079
kWh
$1,462
-
MMBtu
$60
TOTAL IMPLEMENTED $1,216 $1,000 - $1,216
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs