| Assessment Year | 1993 |
|---|---|
| Principal Product | Frozen Vegatables |
| NAICS |
n/a
|
| SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
| Sales Range | $50 M to 100M |
| # of Employees | 180 |
| Plant Area |
n/a
|
| Annual Production | 3,800,000
pieces
|
| Production Hrs. Annual | 4,896
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $148,286 | 4,349,648 |
kWh
|
$0.034 |
| Natural Gas | $15,579 | 3,150 |
MMBtu
|
$4.95 |
| Other Energy | $1,778 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,072 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|
| 01 | 3.4151: Minimize water usage | $1,778 | $286 | - |
$1,778
-
Tgal
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,622 | $1,500 |
$1,622
49,531
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,454 | $4,460 |
$2,454
93,787
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $157 | - |
$157
3,810
kWh
|
- | |
| 05 | 2.4133: Use most efficient type of electric motors | $627 | $1,466 |
$627
19,343
kWh
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $859 | $3,050 |
$859
26,964
kWh
|
- | |
| 07 | 2.6123: Remove unneeded service lines to eliminate potential leaks | $977 | - |
$977
30,774
kWh
|
- | |
| 08 | 2.2628: Utilize a less expensive cooling method | $8,598 | $35,200 |
$8,598
328,253
kWh
|
- | |
| TOTAL RECOMMENDED | $17,072 | $45,962 |
$15,294
552,462
kWh
|
$1,778
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs