ITAC Assessment: OR0166
ITAC logo
ITAC Assessment: OR0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 79
units
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $479,579 11,742,087
kWh
Wood $309,660 547,860
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,052 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,704

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $899 - $899
19,930
kWh
- -
02 2.4133: Use most efficient type of electric motors $1,655 $6,603 $1,655
38,101
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,033 $6,075 $1,033
25,205
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,577 $5,000 $3,577
94,666
kWh
- -
05 2.3212: Optimize plant power factor $6,348 $13,500 $6,348
-
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $28,236 $1,000 - $28,236
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $9,477 $12,988 $6,864
168,230
kWh
- $2,613
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,890 $6,756 $2,012
52,755
kWh
- $878
09 2.4131: Size electric motors for peak operating efficiency $21,937 $100,000 $21,937
669,109
kWh
- -
TOTAL RECOMMENDED $76,052 $151,922 $44,325
1,067,996
kWh
$28,236
-
MMBtu
$3,491
TOTAL IMPLEMENTED $69,704 $138,422 $37,977
1,067,996
kWh
$28,236
-
MMBtu
$3,491
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs