ITAC Assessment: OR0165
ITAC logo
ITAC Assessment: OR0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Frozen Yorurt
NAICS
n/a
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area
n/a
Annual Production 10,700,000
lb
Production Hrs. Annual 3,965
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,612 2,298,359
kWh
Natural Gas $14,778 3,768
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,057

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.2691: Shut off cooling if cold outside air will cool process $4,045 $500 $4,045
121,630
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,788 - - $1,788
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,356 - $850
22,860
kWh
- $506
04 2.3212: Optimize plant power factor $1,074 $2,250 $1,074
-
kWh
- -
05 2.2691: Shut off cooling if cold outside air will cool process $830 - $830
24,912
kWh
- -
06 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $320 $824 $320
8,499
kWh
- -
TOTAL RECOMMENDED $9,413 $3,574 $7,119
177,901
kWh
$1,788
-
MMBtu
$506
TOTAL IMPLEMENTED $8,057 $3,574 $6,269
155,041
kWh
$1,788
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs