ITAC Assessment: OR0163
ITAC logo
ITAC Assessment: OR0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Tempered Glass, Insulate
NAICS
n/a
SIC 3211: Flat Glass
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 8,900
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,912 5,447,831
kWh
Natural Gas $7,785 1,607
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,472 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,172

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $3,055 - $3,055
80,012
kWh
-
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,832 $360 $682
11,723
kWh
$1,150
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,260 $4,000 $4,260
97,890
kWh
-
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $676 $1,436 $676
14,068
kWh
-
05 2.4311: Recover mechanical energy $300 $850 $300
6,741
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $349 - $375
7,327
kWh
$(-26.0)
TOTAL RECOMMENDED $10,472 $6,646 $9,348
217,761
kWh
$1,124
TOTAL IMPLEMENTED $10,172 $5,796 $9,048
211,020
kWh
$1,124
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs