ITAC Assessment: OR0158
ITAC logo
ITAC Assessment: OR0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLYWOOD
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area
n/a
Annual Production 14,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $586,723 13,439,918
kWh
Wood $304,500 2,528,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,398 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,398

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $15,315 $9,000 $15,315
-
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $3,489 $2,600 $3,489
116,647
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $37,810 $34,000 $37,810
972,157
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,216 $2,049 $2,461
63,306
kWh
$(-245.0)
05 2.4133: Use most efficient type of electric motors $568 $8,405 $568
11,723
kWh
-
TOTAL RECOMMENDED $59,398 $56,054 $59,643
1,163,833
kWh
$(-245.0)
TOTAL IMPLEMENTED $59,398 $56,054 $59,643
1,163,833
kWh
$(-245.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs