ITAC Assessment: OR0157
ITAC logo
ITAC Assessment: OR0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MARINE PORTALS
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $1
M
to 5
M
# of Employees 39
Plant Area
n/a
Annual Production 3,300
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,512 556,565
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,118

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6124: Establish equipment maintenance schedule $628 $120 $628
21,102
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $287 $300 $287
4,689
kWh
03 2.4323: Use optimum size and capacity equipment $203 $640 $203
6,741
kWh
04 2.4133: Use most efficient type of electric motors $50 $173 $50
586
kWh
TOTAL RECOMMENDED $1,168 $1,233 $1,168
33,118
kWh
TOTAL IMPLEMENTED $1,118 $1,060 $1,118
32,532
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs