ITAC Assessment: OR0151
ITAC logo
ITAC Assessment: OR0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product EXERCISE MACHINES
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 38,400
pieces
Production Hrs. Annual 2,400
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,206 2,034,584
kWh
Natural Gas $29,448 7,567
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,372

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4156: Use flow control valves on equipment to optimize water use $648 - $648
10,551
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $4,166 $1,710 $4,166
79,426
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $450 $700 $333
6,741
kWh
- $117
04 2.4133: Use most efficient type of electric motors $135 $2,510 $135
2,638
kWh
- -
05 2.2426: Use waste heat from flue gases to heat space conditioning air $1,621 $5,299 - $1,621
-
MMBtu
-
TOTAL RECOMMENDED $7,020 $10,219 $5,282
99,356
kWh
$1,621
-
MMBtu
$117
TOTAL IMPLEMENTED $6,372 $10,219 $4,634
88,805
kWh
$1,621
-
MMBtu
$117
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs