Assessment Year | 1992 |
---|---|
Principal Product | PLYWOOD |
NAICS |
n/a
|
SIC | 2436: Softwood Veneer and Plywood |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 138,800
thousand feet
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,047,819 | 26,935,815 |
kWh
|
$0.039 |
Natural Gas | $59,914 | 14,677 |
MMBtu
|
$4.08 |
Wood | $414,000 | 364,320 |
MMBtu
|
$1.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,038 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,339 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $785 | - |
$889
24,619
kWh
|
- | - | $(-104.0) | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $3,014 | - |
$2,492
62,134
kWh
|
- | - | $522 | |
03 | 2.2122: Install / repair insulation on condensate lines | $500 | $651 | - |
$109
-
MMBtu
|
$391
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,386 | - |
$10,927
308,030
kWh
|
- | - | $4,459 | |
05 | 2.3212: Optimize plant power factor | $16,934 | $36,000 |
$16,934
-
kWh
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,905 | $4,384 |
$1,905
48,066
kWh
|
- | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $514 | $1,900 |
$514
10,551
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $39,038 | $42,935 |
$33,661
453,400
kWh
|
$109
-
MMBtu
|
$391
-
MMBtu
|
$4,877 | ||
TOTAL IMPLEMENTED | $19,339 | $41,035 |
$18,839
48,066
kWh
|
$109
-
MMBtu
|
$391
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs