Assessment Year | 1991 |
---|---|
Principal Product | ICE CREAM, FROZEN YOGURT |
NAICS |
n/a
|
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
n/a
|
Annual Production | 3,000
Tgal
|
Production Hrs. Annual | 2,625
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,867 | 2,952,521 |
kWh
|
$0.031 |
Natural Gas | $25,656 | 6,499 |
MMBtu
|
$3.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,191 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,191 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $1,529 | - | - |
$1,147
-
MMBtu
|
$382 | |
02 | 2.3212: Optimize plant power factor | $1,640 | $1,700 |
$1,640
-
kWh
|
- | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $76 | $60 |
$76
2,052
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,626 | - |
$2,310
68,581
kWh
|
- | $1,316 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $378 | $400 |
$378
12,603
kWh
|
- | - | |
06 | 2.2136: Install / repair insulation on steam lines | $361 | $596 | - |
$361
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $77 | $37 |
$77
2,345
kWh
|
- | - | |
08 | 2.1232: Keep boiler tubes clean | $354 | - | - |
$354
-
MMBtu
|
- | |
09 | 2.4133: Use most efficient type of electric motors | $150 | $462 |
$150
4,982
kWh
|
- | - | |
TOTAL RECOMMENDED | $8,191 | $3,255 |
$4,631
90,563
kWh
|
$1,862
-
MMBtu
|
$1,698 | ||
TOTAL IMPLEMENTED | $8,191 | $3,255 |
$4,631
90,563
kWh
|
$1,862
-
MMBtu
|
$1,698 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs