ITAC Assessment: OR0121
ITAC logo
ITAC Assessment: OR0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product AIR/HYD CYLINDERS
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 22,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,496 2,291,911
kWh
Natural Gas $11,027 2,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,877 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,877

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $2,788 $1,800 $2,788
-
kWh
-
02 2.2511: Insulate bare equipment $1,153 $1,112 $1,153
37,515
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $465 $500 $465
17,878
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $122 $120 $122
3,810
kWh
-
05 2.4133: Use most efficient type of electric motors $174 $519 $174
4,982
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $336 $1,000 - $336
-
MMBtu
07 2.7231: Use radiant heater for spot heating $2,839 $12,320 - $2,839
-
MMBtu
TOTAL RECOMMENDED $7,877 $17,371 $4,702
64,185
kWh
$3,175
-
MMBtu
TOTAL IMPLEMENTED $7,877 $17,371 $4,702
64,185
kWh
$3,175
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs