ITAC Assessment: OR0117
ITAC logo
ITAC Assessment: OR0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product GREEN VENEER ,WOOD CHIPS
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $5
M
to 10
M
# of Employees 46
Plant Area
n/a
Annual Production 350,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,068 2,152,696
kWh
Fuel Oil #2 $34,338 4,986
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,519

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.6232: Install set-back timers $1,159 - $922
27,843
kWh
$237
02 2.7111: Reduce illumination to minimum necessary levels $2,078 - $1,755
52,755
kWh
$323
03 2.3212: Optimize plant power factor $3,134 $6,600 $3,134
-
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $851 - $763
22,860
kWh
$88
05 2.4133: Use most efficient type of electric motors $297 $835 $297
7,034
kWh
-
TOTAL RECOMMENDED $7,519 $7,435 $6,871
110,492
kWh
$648
TOTAL IMPLEMENTED $7,519 $7,435 $6,871
110,492
kWh
$648
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs