ITAC Assessment: OR0113
ITAC logo
ITAC Assessment: OR0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ALES
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range n/a
# of Employees 40
Plant Area
n/a
Annual Production 268
Tgal
Production Hrs. Annual 4,680
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,350 212,192
kWh
Natural Gas $6,364 1,236
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $2,203 $2,100 $(-102.0)
(-2,345)
kWh
- $2,305
02 3.4113: Treat and reuse rinse waters $1,242 - - - $1,242
03 2.4133: Use most efficient type of electric motors $24 $23 $24
586
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $211 $319 $211
1,465
kWh
- -
05 3.4113: Treat and reuse rinse waters $366 - $320
8,206
kWh
- $46
06 2.2623: Minimize condenser cooling water temperature $588 $1,500 $588
10,551
kWh
- -
07 2.2511: Insulate bare equipment $55 $234 - $55
-
MMBtu
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $215 $1,000 - $215
-
MMBtu
-
TOTAL RECOMMENDED $4,904 $5,176 $1,041
18,463
kWh
$270
-
MMBtu
$3,593
TOTAL IMPLEMENTED $3,662 $5,176 $1,041
18,463
kWh
$270
-
MMBtu
$2,351
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs