ITAC Assessment: CO0428
ITAC logo
ITAC Assessment: CO0428
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product custom protective packaging
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area 95,000
ft2
Annual Production 700,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,687 1,005,276
kWh
Electricity Demand $32,954 2,963
kW-mo/yr
Natural Gas $15,218 3,397
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,428 $8,036 $1,191
76,495
kWh
$4,237
-
kW-mo/yr
02 2.7122: Disconnect ballasts $3,050 $350 $660
41,911
kWh
$2,390
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $470 $50 $100
6,448
kWh
$370
-
kW-mo/yr
04 2.4322: Use or replace with energy efficient substitutes $500 $1,750 $110
7,034
kWh
$390
-
kW-mo/yr
TOTAL RECOMMENDED $9,448 $10,186 $2,061
131,888
kWh
$7,387
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs