ITAC Assessment: OK0429
ITAC logo
ITAC Assessment: OK0429
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Starters, alternators, clutch assemblies, and water pumps
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 90,000
ft2
Annual Production 950,000
pieces
Production Hrs. Annual 5,928
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,558 1,888,335
kWh
Natural Gas $23,782 7,542
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,228 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1114: Limit and control secondary combustion air in furnace $1,839 $2,500 - $1,839
-
MMBtu
02 2.2437: Recover waste heat from equipment $1,730 $1,600 - $1,730
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,310 - - $1,310
-
MMBtu
04 2.6212: Turn off equipment during breaks, reduce operating time $638 - $638
12,309
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $711 $2,806 $711
9,672
kWh
-
TOTAL RECOMMENDED $6,228 $6,906 $1,349
21,981
kWh
$4,879
-
MMBtu
TOTAL IMPLEMENTED $5,517 $4,100 $638
12,309
kWh
$4,879
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs