| Assessment Year | 1991 |
|---|---|
| Principal Product | KILN DRIED LUMBER |
| NAICS |
n/a
|
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $1 M to 5M |
| # of Employees | 30 |
| Plant Area |
n/a
|
| Annual Production | 24,200
thousand feet
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $58,629 | 1,969,812 |
kWh
|
$0.030 |
| Natural Gas | $106,179 | 34,385 |
MMBtu
|
$3.09 |
| Wood | $218,036 | 137,051 |
MMBtu
|
$1.59 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,094 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Wood Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2123: Insulate feedwater tank | $976 | $532 | - |
$815
-
MMBtu
|
$161
-
MMBtu
|
- | |
| 02 | 2.3212: Optimize plant power factor | $742 | $750 |
$742
-
kWh
|
- | - | - | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $229 | - |
$181
9,672
kWh
|
- | - | $48 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $500 | $1,048 |
$500
7,913
kWh
|
- | - | - | |
| 05 | 2.2511: Insulate bare equipment | $12,011 | $40,000 | - |
$3,912
-
MMBtu
|
$8,099
-
MMBtu
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $62 | $195 |
$62
1,465
kWh
|
- | - | - | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,574 | $7,400 |
$1,574
58,324
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $16,094 | $49,925 |
$3,059
77,374
kWh
|
$4,727
-
MMBtu
|
$8,260
-
MMBtu
|
$48 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Wood Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs