ITAC Assessment: OR0112
ITAC logo
ITAC Assessment: OR0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product KILN DRIED LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 24,200
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,629 1,969,812
kWh
Natural Gas $106,179 34,385
MMBtu
Wood $218,036 137,051
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings
01 2.2123: Insulate feedwater tank $976 $532 - $815
-
MMBtu
$161
-
MMBtu
-
02 2.3212: Optimize plant power factor $742 $750 $742
-
kWh
- - -
03 2.7111: Reduce illumination to minimum necessary levels $229 - $181
9,672
kWh
- - $48
04 2.7142: Utilize higher efficiency lamps and/or ballasts $500 $1,048 $500
7,913
kWh
- - -
05 2.2511: Insulate bare equipment $12,011 $40,000 - $3,912
-
MMBtu
$8,099
-
MMBtu
-
06 2.4133: Use most efficient type of electric motors $62 $195 $62
1,465
kWh
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,574 $7,400 $1,574
58,324
kWh
- - -
TOTAL RECOMMENDED $16,094 $49,925 $3,059
77,374
kWh
$4,727
-
MMBtu
$8,260
-
MMBtu
$48
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs