ITAC Assessment: OR0110
ITAC logo
ITAC Assessment: OR0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ALES
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range $500
k
to 1
M
# of Employees 14
Plant Area
n/a
Annual Production 126
Tgal
Production Hrs. Annual 4,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,953 128,077
kWh
Natural Gas $5,540 1,068
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,914 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,914

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $102 $51 - $102
-
MMBtu
-
02 3.4157: Replace water cooling on processes with air cooling $1,988 - $(-128.0)
(-2,931)
kWh
- $2,116
03 2.7142: Utilize higher efficiency lamps and/or ballasts $323 - $124
2,931
kWh
- $199
04 3.4151: Minimize water usage $370 - - $249
-
MMBtu
$121
05 2.7142: Utilize higher efficiency lamps and/or ballasts $62 $150 $62
1,758
kWh
- -
06 2.4322: Use or replace with energy efficient substitutes $1,069 $1,500 - $1,069
-
MMBtu
-
TOTAL RECOMMENDED $3,914 $1,701 $58
1,758
kWh
$1,420
-
MMBtu
$2,436
TOTAL IMPLEMENTED $3,914 $1,701 $58
1,758
kWh
$1,420
-
MMBtu
$2,436
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs