Assessment Year | 1991 |
---|---|
Principal Product | ASPHALT ROOFING |
NAICS |
n/a
|
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 71 |
Plant Area |
n/a
|
Annual Production | 89,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $128,287 | 2,832,943 |
kWh
|
$0.045 |
Natural Gas | $116,898 | 45,354 |
MMBtu
|
$2.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $164,550 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $164,550 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,299 | - |
$1,199
25,498
kWh
|
- | $100 | |
02 | 3.4115: Recover and reuse cooling water | $123,679 | - |
$1,350
26,084
kWh
|
- | $122,329 | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $15,674 | $10,500 | - |
$15,674
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,622 | $10,000 |
$11,622
262,016
kWh
|
- | - | |
05 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $10,621 | - |
$8,848
239,449
kWh
|
- | $1,773 | |
06 | 2.4133: Use most efficient type of electric motors | $330 | $420 |
$330
7,034
kWh
|
- | - | |
07 | 2.3212: Optimize plant power factor | $996 | $2,550 |
$996
-
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $329 | $1,475 |
$329
6,741
kWh
|
- | - | |
TOTAL RECOMMENDED | $164,550 | $24,945 |
$24,674
566,822
kWh
|
$15,674
-
MMBtu
|
$124,202 | ||
TOTAL IMPLEMENTED | $164,550 | $24,945 |
$24,674
566,822
kWh
|
$15,674
-
MMBtu
|
$124,202 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs