| Assessment Year | 1991 |
|---|---|
| Principal Product | ASPHALT ROOFING |
| NAICS |
n/a
|
| SIC | 2952: Asphalt Felts and Coatings |
| Sales Range | $10 M to 50M |
| # of Employees | 71 |
| Plant Area |
n/a
|
| Annual Production | 89,000
ton
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $128,287 | 2,832,943 |
kWh
|
$0.045 |
| Natural Gas | $116,898 | 45,354 |
MMBtu
|
$2.58 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $164,550 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $164,550 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $1,299 | - |
$1,199
25,498
kWh
|
- | $100 | |
| 02 | 3.4115: Recover and reuse cooling water | $123,679 | - |
$1,350
26,084
kWh
|
- | $122,329 | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $15,674 | $10,500 | - |
$15,674
-
MMBtu
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,622 | $10,000 |
$11,622
262,016
kWh
|
- | - | |
| 05 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $10,621 | - |
$8,848
239,449
kWh
|
- | $1,773 | |
| 06 | 2.4133: Use most efficient type of electric motors | $330 | $420 |
$330
7,034
kWh
|
- | - | |
| 07 | 2.3212: Optimize plant power factor | $996 | $2,550 |
$996
-
kWh
|
- | - | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $329 | $1,475 |
$329
6,741
kWh
|
- | - | |
| TOTAL RECOMMENDED | $164,550 | $24,945 |
$24,674
566,822
kWh
|
$15,674
-
MMBtu
|
$124,202 | ||
| TOTAL IMPLEMENTED | $164,550 | $24,945 |
$24,674
566,822
kWh
|
$15,674
-
MMBtu
|
$124,202 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs