ITAC Assessment: OR0107
ITAC logo
ITAC Assessment: OR0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ASPHALT ROOFING
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area
n/a
Annual Production 89,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,287 2,832,943
kWh
Natural Gas $116,898 45,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $164,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $164,550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,299 - $1,199
25,498
kWh
- $100
02 3.4115: Recover and reuse cooling water $123,679 - $1,350
26,084
kWh
- $122,329
03 2.1233: Analyze flue gas for proper air/fuel ratio $15,674 $10,500 - $15,674
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,622 $10,000 $11,622
262,016
kWh
- -
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $10,621 - $8,848
239,449
kWh
- $1,773
06 2.4133: Use most efficient type of electric motors $330 $420 $330
7,034
kWh
- -
07 2.3212: Optimize plant power factor $996 $2,550 $996
-
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $329 $1,475 $329
6,741
kWh
- -
TOTAL RECOMMENDED $164,550 $24,945 $24,674
566,822
kWh
$15,674
-
MMBtu
$124,202
TOTAL IMPLEMENTED $164,550 $24,945 $24,674
566,822
kWh
$15,674
-
MMBtu
$124,202
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs