ITAC Assessment: OR0099
ITAC logo
ITAC Assessment: OR0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SHIPPING CONTAINERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 30,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,436 1,313,892
kWh
Natural Gas $14,138 3,419
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $669 $50 $669
16,706
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $511 $60 $411
10,258
kWh
- $100
03 2.4133: Use most efficient type of electric motors $53 $117 $53
1,465
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $399 $1,480 $399
9,965
kWh
- -
05 2.7492: Use proper thickness of insulation on building envelope $5,167 $20,751 - $5,167
-
MMBtu
-
TOTAL RECOMMENDED $6,799 $22,458 $1,532
38,394
kWh
$5,167
-
MMBtu
$100
TOTAL IMPLEMENTED $1,180 $110 $1,080
26,964
kWh
- $100
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs