ITAC Assessment: OR0094
ITAC logo
ITAC Assessment: OR0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SOFTWOOD PLYWOOD
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 132,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,035,943 24,638,043
kWh
Wood $459,000 439
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.2441: Preheat boiler makeup water with waste process heat $7,780 $7,203 - $7,780
-
MMBtu
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $21,231 $26,775 $2,399
70,047
kWh
- $18,832
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $58,836 $75,000 $58,836
1,432,591
kWh
- -
04 2.4133: Use most efficient type of electric motors $1,592 $2,987 $1,592
36,928
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,207 $600 $8,207
210,434
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,805 $8,000 $10,805
254,982
kWh
- -
TOTAL RECOMMENDED $108,451 $120,565 $81,839
2,004,982
kWh
$7,780
-
MMBtu
$18,832
TOTAL IMPLEMENTED $41,835 $38,362 $23,003
572,391
kWh
- $18,832
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs