Assessment Year | 1990 |
---|---|
Principal Product | PLASTIC PIPE |
NAICS |
n/a
|
SIC | 3084: Plastics Pipe |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 23,900,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $252,342 | 5,463,951 |
kWh
|
$0.046 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,141 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $65,125 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.6121: Reduce hot water temperature to the minimum required | $64,713 | $5,000 |
$(-11,937.0)
(-264,654)
kWh
|
$76,650 | |
02 | 2.4133: Use most efficient type of electric motors | $412 | $509 |
$412
9,086
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $1,562 | $3,277 |
$1,562
41,032
kWh
|
- | |
04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $1,098 | $2,400 |
$1,098
28,722
kWh
|
- | |
05 | 2.3212: Optimize plant power factor | $687 | $1,950 |
$687
-
kWh
|
- | |
06 | 2.8114: Change rate schedules or other changes in utility service | $6,669 | $22,569 |
$7,769
-
kWh
|
$(-1,100.0) | |
TOTAL RECOMMENDED | $75,141 | $35,705 |
$(-409.0)
(-185,814)
kWh
|
$75,550 | ||
TOTAL IMPLEMENTED | $65,125 | $5,509 |
$(-11,525.0)
(-255,568)
kWh
|
$76,650 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs