ITAC Assessment: OR0084
ITAC logo
ITAC Assessment: OR0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PLASTIC CONTAINERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area
n/a
Annual Production 11,000,000
lb
Production Hrs. Annual 7,008
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $524,930 11,477,140
kWh
Natural Gas $24,512 4,684
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,903 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,291

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $604 $278 $604
16,413
kWh
-
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $461 $592 $370
9,965
kWh
$91
03 2.4133: Use most efficient type of electric motors $1,603 $2,563 $1,603
33,998
kWh
-
04 2.2511: Insulate bare equipment $1,837 $3,500 $1,837
49,824
kWh
-
05 2.8114: Change rate schedules or other changes in utility service $9,851 $18,000 $9,851
-
kWh
-
06 2.3212: Optimize plant power factor $3,547 $9,000 $3,547
-
kWh
-
TOTAL RECOMMENDED $17,903 $33,933 $17,812
110,200
kWh
$91
TOTAL IMPLEMENTED $13,291 $24,063 $13,291
83,822
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs