ITAC Assessment: OR0079
ITAC logo
ITAC Assessment: OR0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PAPER BAGS
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $10
M
to 50
M
# of Employees 44
Plant Area
n/a
Annual Production 600,000,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,159 1,376,026
kWh
Natural Gas $13,617 2,573
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $5,596 $312 $5,596
95,252
kWh
-
02 2.4133: Use most efficient type of electric motors $148 $50 $148
2,931
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,902 $1,000 $1,902
38,101
kWh
-
04 2.3212: Optimize plant power factor $473 $1,200 $473
-
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $7,374 $31,672 - $7,374
-
MMBtu
TOTAL RECOMMENDED $15,493 $34,234 $8,119
136,284
kWh
$7,374
-
MMBtu
TOTAL IMPLEMENTED $2,050 $1,050 $2,050
41,032
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs