Assessment Year | 1990 |
---|---|
Principal Product | FRESH CHICKENS AND FEED |
NAICS |
n/a
|
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 8,459,761
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $246,085 | 4,838,218 |
kWh
|
$0.051 |
Natural Gas | $161,607 | 43,191 |
MMBtu
|
$3.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,825 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,454 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,574 | $1,000 | - |
$4,574
-
MMBtu
|
|
02 | 2.4133: Use most efficient type of electric motors | $1,005 | $652 |
$1,005
19,637
kWh
|
- | |
03 | 2.2122: Install / repair insulation on condensate lines | $655 | $345 | - |
$655
-
MMBtu
|
|
04 | 2.1213: Direct warmest air to combustion intake | $658 | $390 | - |
$658
-
MMBtu
|
|
05 | 2.2621: Modify refrigeration system to operate at a lower pressure | $3,222 | $3,600 |
$3,222
77,667
kWh
|
- | |
06 | 2.2511: Insulate bare equipment | $206 | $333 | - |
$206
-
MMBtu
|
|
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,585 | $6,190 |
$2,585
50,703
kWh
|
- | |
08 | 2.2122: Install / repair insulation on condensate lines | $434 | $1,118 | - |
$434
-
MMBtu
|
|
09 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $486 | $1,553 | - |
$486
-
MMBtu
|
|
TOTAL RECOMMENDED | $13,825 | $15,181 |
$6,812
148,007
kWh
|
$7,013
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,454 | $8,986 |
$2,585
50,703
kWh
|
$5,869
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs