ITAC Assessment: OR0076
ITAC logo
ITAC Assessment: OR0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product FRESH CHICKENS AND FEED
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 8,459,761
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $246,085 4,838,218
kWh
Natural Gas $161,607 43,191
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,454

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,574 $1,000 - $4,574
-
MMBtu
02 2.4133: Use most efficient type of electric motors $1,005 $652 $1,005
19,637
kWh
-
03 2.2122: Install / repair insulation on condensate lines $655 $345 - $655
-
MMBtu
04 2.1213: Direct warmest air to combustion intake $658 $390 - $658
-
MMBtu
05 2.2621: Modify refrigeration system to operate at a lower pressure $3,222 $3,600 $3,222
77,667
kWh
-
06 2.2511: Insulate bare equipment $206 $333 - $206
-
MMBtu
07 2.2614: Use cooling tower or economizer to replace chiller cooling $2,585 $6,190 $2,585
50,703
kWh
-
08 2.2122: Install / repair insulation on condensate lines $434 $1,118 - $434
-
MMBtu
09 2.2449: Recover heat from exhausted steam, hot air or hot water $486 $1,553 - $486
-
MMBtu
TOTAL RECOMMENDED $13,825 $15,181 $6,812
148,007
kWh
$7,013
-
MMBtu
TOTAL IMPLEMENTED $8,454 $8,986 $2,585
50,703
kWh
$5,869
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings