ITAC Assessment: OR0065
ITAC logo
ITAC Assessment: OR0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ROCK CRUSHING EQUIPMENT
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area
n/a
Annual Production 276
pieces
Production Hrs. Annual 4,556
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,105 2,395,369
kWh
Natural Gas $38,172 7,033
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,285 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,501

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $5,924 $2,050 - $5,924
-
MMBtu
-
02 2.7111: Reduce illumination to minimum necessary levels $2,603 $1,075 $2,106
50,703
kWh
- $497
03 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $338 $150 $338
6,448
kWh
- -
04 2.4133: Use most efficient type of electric motors $394 $279 $394
7,327
kWh
- -
05 2.3212: Optimize plant power factor $5,181 $5,400 $5,181
-
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,845 $2,000 $1,845
34,877
kWh
- -
TOTAL RECOMMENDED $16,285 $10,954 $9,864
99,355
kWh
$5,924
-
MMBtu
$497
TOTAL IMPLEMENTED $8,501 $4,479 $2,577
48,652
kWh
$5,924
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs