Assessment Year | 1989 |
---|---|
Principal Product | RESINS |
NAICS |
n/a
|
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
n/a
|
Annual Production | 214,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $305,181 | 12,270,809 |
kWh
|
$0.025 |
Natural Gas | $445,173 | 114,313 |
MMBtu
|
$3.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $323,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,867 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2163: Use minimum steam operating pressure | $5,427 | - | - |
$5,427
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $30,066 | - | - |
$30,066
-
MMBtu
|
- | |
03 | 2.2111: Install steam trap | $4,000 | $1,225 | - |
$3,007
-
MMBtu
|
$993 | |
04 | 2.4133: Use most efficient type of electric motors | $1,306 | $952 |
$1,306
52,462
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $801 | $635 |
$328
13,189
kWh
|
- | $473 | |
06 | 2.2141: Operate distillation columns efficiently | $275,459 | $298,045 | - |
$275,459
-
MMBtu
|
- | |
07 | 2.3212: Optimize plant power factor | $5,520 | $6,300 |
$5,520
-
kWh
|
- | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $913 | $968 |
$584
32,825
kWh
|
- | $329 | |
TOTAL RECOMMENDED | $323,492 | $308,125 |
$7,738
98,476
kWh
|
$313,959
-
MMBtu
|
$1,795 | ||
TOTAL IMPLEMENTED | $34,867 | $1,860 |
$328
13,189
kWh
|
$33,073
-
MMBtu
|
$1,466 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs