ITAC Assessment: OR0063
ITAC logo
ITAC Assessment: OR0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product RESINS
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 214,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,181 12,270,809
kWh
Natural Gas $445,173 114,313
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $323,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,867

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2163: Use minimum steam operating pressure $5,427 - - $5,427
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $30,066 - - $30,066
-
MMBtu
-
03 2.2111: Install steam trap $4,000 $1,225 - $3,007
-
MMBtu
$993
04 2.4133: Use most efficient type of electric motors $1,306 $952 $1,306
52,462
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $801 $635 $328
13,189
kWh
- $473
06 2.2141: Operate distillation columns efficiently $275,459 $298,045 - $275,459
-
MMBtu
-
07 2.3212: Optimize plant power factor $5,520 $6,300 $5,520
-
kWh
- -
08 2.7111: Reduce illumination to minimum necessary levels $913 $968 $584
32,825
kWh
- $329
TOTAL RECOMMENDED $323,492 $308,125 $7,738
98,476
kWh
$313,959
-
MMBtu
$1,795
TOTAL IMPLEMENTED $34,867 $1,860 $328
13,189
kWh
$33,073
-
MMBtu
$1,466
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs